ISSN: 2319-9873

Reach Us +44 7456 035580
All submissions of the EM system will be redirected to Online Manuscript Submission System. Authors are requested to submit articles directly to Online Manuscript Submission System of respective journal.

Waste Heat Recovery: A Special Case

Mohammad S*, Salahuddin H, Al-Far A and Al-khatib L

Department of Mechanical Engineering, University of Jordan, Jordan

*Corresponding Author:
Mohammad S
Department of Mechanical Engineering
University of Jordan, Jordan
E-mail: m.soubeh@hotmail.com

Received: 18 August 2015 Accepted: 08 October 2015 Published: 15 October 2015

Visit for more related articles at Research & Reviews: Journal of Engineering and Technology

Abstract

Lafarge Cement Factory at Al-Fuhais (Jordan) was marked of having some energy issues which required performing site visits for defining, locating and gathering any required information related to the energy issue. Considerable amounts of waste energy were detected in exhaust gases. Moving a light spot into the exhaust gases led to quantify their available heat content and then to look for an implementation for the recovered expelled energy. Among many alternatives, electricity generation was chosen by introducing an Organic Rankine Cycle (ORC) as an intermediary system between the hot exhaust gases and ambient. The operating conditions for the ORC were optimized to capture the expelled energy. For the selected working fluid (refrigerant R-123), the efficiency of ORC was found to be 14.45%. The recovered energy was found monthly varying in range of [239.9, 271.6] MW.hr, this represents only 2.66 – 3% of factory's electricity consumption. Cost saving of 500,000 $ (2.82%) from the annually total amount spent on electricity was attained.

Keywords

Heat, Energy, Organic Rankine Cycle (ORC).

Introduction

The main aim is to lift the energy efficiency in Lafarge factory by recovering the waste heat. Energy bills have major effect upon cement production. Being more efficient in energy usage leads to reducing the amount of money spent on energy; thus, getting lower production costs and thereby better competitive place. Economic and environmental aspects of being more energy efficient could be seen through [1]:

• Using the exhaust gases in any production process where heat is a key role saves the costs of cooling and filtering of exhaust gases before discharging them into the atmosphere.

• Generating electricity (for example) from the recovered waste heat would shrink the electricity bill. The more the electricity generated from waste heat source the greater the shrinkage in electricity bill.

• Waste heat recovery prevents harming the environment by lowering the high temperatures of exhaust gases.

This project is meant to look for an opportunity of being more efficient in energy usage. Once found, the trend was to optimize the operation conditions for various components of WHR unit to recover the maximum amount of expelled energy without designing or selecting them individually.

Methodology

Lafarge cement factory in Al-Fuhais is one of the main cement factories in Jordan and fortunately it has waste heat issue with increasing in production due to increasing demand. This encourages the consideration of moving Lafarge factory into a light spot to study the possibility of recovering its waste heat and converting it to a more usable form of energy. This requires a clear well thoughtful plan to understand, analyze and solve the waste heat issue in the best way.

The following are the procedures which were taken and implemented to reach to the best results (Figure 1).

engineering-technology-Implemented-project-procedure

Figure 1: Implemented project procedure.

Site visits

Defining and locating the energy issue, then gathering the required data (Figure 2).

engineering-technology-Factory-layout-principal-processes

Figure 2: Factory layout with principal processes data.

Energy analysis

Once all energy uses have been identified and quantified, analysis begins to estimate the amount of heat content in exhaust gases being discharged in order to determine the available energy that can be recovered, since energy is a system-environment property, it is necessary to consider the geographical location and weather data of factory while calculating the available energy (Figures 3 and 4).

engineering-technology-The-average-monthly-temperature

Figure 3: The average monthly temperature variation throughout the year.

engineering-technology-Maximum-heat-potential-available

Figure 4: Maximum heat potential and available energy variation.

Thermodynamic Cycle Selection

After specifying the amount of recovered energy from waste exhaust gases, it is necessary now to look for an implementation to utilize the available recovered energy in-hand. Employing this recovered energy in serving factory needs could be implemented through different waste heat recovery methods. Electricity generating using Organic Rankine Cycle (ORC) instead of using Steam Rankine Cycle or Kalina Cycle because the conditions of factory waste heat and factory requirements are all met in ORC features. This makes choosing ORC for waste heat recovery become much reasonable since ORC features tend to be the most optimized alternative.

Modeling of ORC

ORC is designed to work in a steady state at the sub-critical region. The condenser saturation temperature is designed to be above the ambient temperature at summer with a minimum difference of 7°C. The isentropic pump efficiency, isentropic and mechanical turbine efficiencies are known [1]. Further assumptions are: that state-1 at the pump inlet is saturated liquid and the heat exchanger has a specified effectiveness. Also, it is assumed that there is no pressure drop and heat loss through the pipelines and cycle components. The working fluid at the inlet of the turbine (state-3) is saturated vapor. Isentropic efficiencies for different components and heat exchanger effectiveness are as following:

• Turbine's isentropic efficiency is 85%

• Turbine's mechanical efficiency is 85%

• Pump's isentropic efficiency is 70%

• Heat exchanger's effectiveness is 85%

The layout of the factory after introducing the ORC is shown in the following Figure 5.

engineering-technology-Factory-layout-after-introducing

Figure 5: Factory layout after introducing ORC.

Fluid Selection

Analyses were made to find the best performance of ORC, and the working fluids have been selected from ASHRAE standard-34 [2] and classified as given by ASHRAE Safety classification [3] (Table 1).

  Lower toxicity Higher toxicity
Higher flammability A3 B3
Lower flammability A2 B2
No flame propagation A1 B1

Table 1: ASHRAE safety classification.

Optimum operation of ORC

The following procedure was done to find the best operation conditions [4] (i.e. working fluid and operating pressures) for ORC:

• The lower pressure (condenser pressure) is selected to maintain the working fluid saturated temperature at 7°C above the maximum ambient temperature in summer (August).

• The upper pressure (heat exchanger pressure) was varied below the critical pressure of each fluid.

• The optimum upper pressure of each refrigerant is selected where the highest thermal efficiency and network output is obtained taking into consideration being 20°C below the fluid critical temperature at the turbine inlet.

Finally, the screening criteria of the best operation conditions for the ORC are found by selecting the maximum thermal efficiency, maximum net power output and maximum second law efficiency after comparing the optimum operations of the working fluids (Figure 6).

engineering-technology-Variation-ORC-efficiency-heat

Figure 6: Variation of ORC efficiency with heat exchanger’s operation pressure.

Results

To maintain this cycle operating at constant efficiency, the working fluid mass flow rate has to be controlled. Controlling the mass flow rate depends upon the heat input to avoid superheating or high quality saturation mixure at the turbine inlet.

Constrained by the mentioned conditions, the resulting net output power of the ORC was obtained by considering controlled mass flow rate and constant efficiency during the operation. The following Figure 7, visualize the recovered energy when using R-123 as the working fluid:

engineering-technology-The-power-delivered-month

Figure 7: The power that can be delivered per month.

Cost Saving

Using R-123 for ORC, the minimum and maximum amounts of heat that can be recovered is shown in Figure 8. In order to utilize this recovered waste heat, they are visualized in Figure 9 as percentages of the factory electricity consumption which is nearly 9 GW.hr monthly.

engineering-technology-Minimum-maximum-amounts-heat

Figure 8: Minimum and maximum amounts of heat that can be recovered.

engineering-technology-Visualization-minimum-maximum-amounts

Figure 9: Visualization of minimum and maximum amounts of saving.

Based on the percentages of saving, the amount of cost that can be saved was estimated. After contacting the factory

Notice that the savings are depending on the recovered energy which varies every month. The same procedure was used for the rest of year months as the following Figure 10 shows the total savings was found to be 350,000 JD per year.

engineering-technology-Total-cost-saving

Figure 10: Total cost saving.

Payback Period

The installation cost for ORC is in range from [2000, 4000] $ per kW produced [5].By taking the upper limit 4000 $ / kW, the installation cost for a power output of 450 kW is (1,278,000) $.

The payback period for this investment would be (3 years and 8 months).

Conclusions

• Any source of any form of waste energy is not necessarily being non-useful anymore. Interesting amounts of energy contents may be found in waste energy sources especially when confronting elevated temperatures, high vibrations or huge flow rates.

• Even if the recovered energy from the waste energy source seems to be small, it still holds the name of energy. One of auxiliary equipment’s can be driven and/or energy usage of some sectors can be covered by the recovered energy.

• Any source of waste energy has its inherent conditions of form of energy being wasted. Also, it must be assured that the recovery method fits the conditions of waste energy source and can convert the form of energy being wasted into more desirable form. As seen in this study, ORC is applicable at the temperature range of exhaust gases and fulfill the requirement of converting the waste heat into electricity.

• Bounded by many factors imposed by the conditions of exhaust gases and ambient, optimization of ORC operation conditions to get maximum work output within some boundaries is depending upon the working fluid being used. Selection of working fluid depends upon its thermodynamic and critical point properties.

Although the electricity generated from the recovered energy looks tiny when compared to factory's total electricity consumption, it is very profitable and useful. This small portion is large enough when compared to factory's massive electricity consumption. The same applies for costs being saved; saving a small fraction from huge amount of money yields large enough savings.

References